Construction cost estimating
Itemised estimates for whole projects or stages, built from your drawings and specifications.
Learn about cost estimatesAussie Estimating measures your drawings and prepares itemised cost estimates, so you can price tenders, check budgets and make project decisions with the numbers laid out in front of you.
Whether you need a full project estimate or just the quantities for one trade, the aim is the same: a measured, itemised breakdown you can check, adjust and rely on when you set your price.
Itemised estimates for whole projects or stages, built from your drawings and specifications.
Learn about cost estimatesMeasured quantities of materials and work items, ready for you to apply your own rates.
Learn about quantity takeoffsFocused pricing for a single trade package, suited to subcontractors pricing their scope.
Learn about trade estimatesThe quantities and pricing breakdown behind your submission, prepared to your deadline.
Learn about tender supportCosts split into materials and labour so you can compare suppliers, crews and options.
Learn about cost breakdownsEstimating takes hours of careful work, often at night or on weekends when a tender is due. Handing the measuring and pricing to a dedicated estimator frees you to run your jobs, while still giving you a detailed estimate to review before you commit.
Upload drawings, specifications and your due date through the quote request form.
We review the documents, confirm what is to be measured and priced, and send a quote for the work.
Once you approve, we carry out the takeoff and build the estimate, raising questions if the drawings leave gaps.
You receive the itemised estimate, usually within 2–3 days, with assumptions listed and ready to check for your tender or budget.
A construction cost estimate is a forecast of what a project is likely to cost to build. It is based on the drawings, specifications and scope available at the time, and usually breaks the cost into trades or work items covering materials, labour, plant and other allowances.
A quantity takeoff measures what is on the drawings, such as square metres of slab, linear metres of wall or the number of doors. A cost estimate takes those quantities and applies rates for materials and labour to arrive at a price. Some clients only need the quantities so they can apply their own rates.
Send the current drawings, any specifications or scope documents, the tender or due date, and a note on what you want priced. If you only need certain trades or sections measured, say so. The more complete the documents, the more precise the quote for our work can be.
Yes. We can prepare the quantities and pricing breakdown that sit behind your tender, so you have a clear, itemised basis for your submission. You stay in control of your final price, margins and the tender itself.
Yes. Trade-specific estimates and takeoffs are designed for subcontractors who need measured quantities and pricing for their own scope without paying for a full project estimate.
Most estimates are completed within 2–3 days. Larger or more complex projects can take longer, and we confirm a delivery date with every quote.
Pricing depends on the project type, size, complexity and scope of work. We review your plans first, then give you a quote for the estimating work.
Revisions are free of charge when they fall within the agreed scope of work. Changes that add new work outside that scope are quoted separately.
We work with builders, trades and developers across Australia, from our office in North Melbourne, Victoria.
Send them through with your due date and we will confirm the scope and quote the estimating work.